Redevelopment: plus energy apartment building, Berne, Suisse

General information
Type of building Redevelopment of an apartment building from 1959 with former 19 smaller flats to a plus energy house with 7 big flats
Ventilation concept Regulated apartment ventilation with heat recovery in all rooms
Supply and exhaust air e² with heat recovery
Exhaust air ego with heat recovery
Completion May 2014
Energy standard Standard of suisse "GEAK", category AA
Architect Quadrat AG, Zollikofen

New building: "Wohnpark am Wuhle Ufer", Berlin, Germany

General information
Type of building New building of apartment buildings with one meeting point
Ventilation concept Regulated apartment ventilation with heat recovery and exhaust air in the utility rooms
Supply and exhaust air e² with heat recovery and fresh air transfer devices with LUNOtherm facade elements
Exhaust air Silvento UP series
Completion January 2014
Energy standard KfW 55
Architect BWV to Köpenick

New building: apartment buildings with meeting point, Düsseldorfer Street 24, Berlin, Germany

General information
Type of building Building of a new apartment with meeting point
Ventilation concept Regulated apartment ventilation with heat recovery and exhaust air in the utility rooms
Supply and exhaust air e² with heat recovery and fresh air transfer devices with LUNOtherm facade elements
Exhaust air Silvento UP series
Completion April 2013

Redevelopment: Horner Landstreet, Hamburg, Germany

General information
Type of building Redevelopment of an apartment building from the 1950s
Ventilation concept Regulated apartment ventilation with heat recovery within the hybrid system with decentralized exhaust air systems
Supply and exhaust air e² with heat recovery and exhaust air with Silvento-products
Completion Automn 2012
Energy standard KfW 70

New building: single family house in Freudenstadt, Black Forest, Germany

General information
Type of building New building of a KfW40 single familiy house
Ventilation concept Regulated apartment ventilation with heat recovery in the living spaces and exhaust air in the utility room and inside bathroom as hybrid system
Supply and exhaust air e² with heat recovery
Exhaust air Silvento UP series
Completion June 2012
Energy standard KFW 40 standard: High heat insulation cause by the insulation out of 100% derived timber product integrated into the timber frame, local hybrid ventilation system with heat recovery, photovoltaic systems, heating and hot water generated by a pellet and solar heat system

New building: three apartment buildings at Bremer Werder, Bremen, Germany

General information
Type of building Three new apartment buildings
Ventilation concept Regulated apartment ventilation with heat recovery in the living spaces and exhaust air in the utility room and inside bathroom as hybrid system
Supply and exhaust air e² with heat recovery
Exhaust air Silvento UP series
Completion April 2012

New building: passive house in Iskele Mah. Urla, Izmir, Turkey

General information
Type of building First turkey passive house, which has been build closed to Izmir
Ventilation concept Regulated apartment ventilation with heat recovery
Supply and exhaust air e² with heat recovery
Completion Spring 2012
Energy standard Standard of passive houses. Energy consumption: g-Wert < 0,16 W/(m2K); double-glazed windows, Ug-Wert < 1,2 W/(m2K)

Redevelopment: Norderstreet 51-53, Eckernförde, Germany

General information
Type of building Redevelopment of two 70s multistorey buildings
Ventilation concept Regulated apartment ventilation with heat recovery in the living spaces, exhaust air system in the inside bathroom
Supply and exhaust air e² with heat recovery
Exhaust air System pursuant to DIN 18017-3
Completion September 2011
Energy standard KFW 85 standard: High heat insulation (200 mm), triple-glazed windows (Ug=0,8 W/m2K)

New building: apartment building in Babelsbergerstreet, Berlin, Germany

General information
Type of building New building of an inner-city living complex with 43 apartments and a basement garage for 57 cars
Ventilation concept Regulated apartment ventilation depending on humidity and temperature with heat recovery, fresh air transfer devices with LUNOtherm facade elements
Supply air LUNOtherm B 100 with air transfer device ALD-R160L
Exhaust air Silvento 30-60FK with humidity and temperature dependent control
Completion Summer 2010
Energy standard Consumption of end-use energy of 22,6 kWh/m2a caused by an intelligent integration of heating, ventilation system, exhaust air heat pump and a big hot water storage tank
Architect Wiewiorra Hopp Architects, Berlin, Germany

New building: III Towers, Bratislava, Slovakia

General information
Type of building New apartment and office building complex with three elliptic apartment towers
Ventilation concept Regulated apartment ventilation with exhaust air system and air transfer devices for supply air
Supply air LUNOtherm A200 und A120 and air transfer devices ALD-R160L
Completion November 2009
Energy standard KFW 40 standard: High heat insulation, triple-glazed windows, humidity-regulated exhaust air system with air transfer devices

New building: apartment building Bärenschanze, Nuremberg, Germany

General information
Type of building New town apartment buildings with aprrox. 110 apartments and planning of 68 rented flats, public-funded, with basement garage
Ventilation concept Regulated apartment ventilation with exhaust air system and air transfer devices for supply air
Supply air LUNOtherm B 160 with air transfer device ALD-R160L
Completion September 2008
Energy standard KFW 40 standard: high heat insulation (160 mm), triple-glazed windows, regulated apartment ventilation with exhaust air system and air transfer devices for supply air and use of district heat
Architect Grabow + Hofmann Architect partner, Nuremberg

New building: apartment houses in Erasmustreet, Wiesbaden, Germany

General information
Type of building New building of an apartment house
Ventilation concept Regulated apartment ventilation with exhaust air system and air transfer devices for supply air
Supply air LUNOtherm B120 with air transfer device ALD-R160L
Completion January 2008
Energy standard EnEV 2007
Architect Health insurance of the building sector"VVaG, SOKA-Bau"

New building: single family house in the Haydnallee, Falkensee, Germany

General information
Type of building New building of a KFW40 single familiy house
Ventilation concept Regulated apartment ventilation with humidity-regulated exhaust air fans
Supply air LUNOtherm A200 and A120 with air transfer device ALD-R160L
Exhaust air LUNOmat F
Completion End of 2007
Energy standard KFW 40 standard: High heat insulation cause by the insulation out of 100% derived timber product integrated into the timber frame, local hybrid ventilation system with heat recovery, photovoltaic systems, heating and hot water generated by a pellet and solar heat system

New building: office building "Octopus", Bratislava, Slovakia

General information
Type of building New building of an office house with living flats at the top floors
Ventilation concept Regulated apartment ventilation with humidity-regulated exhaust air systems and air transfer devices for supply air
Supply air LUNOtherm A140 with air transfer device ALD-R160L
Exhaust air Carparison ventilation Skalar-F with humidity-regulation and Skalar-G with a controlling, carried out in two stages
Completion March 2007
Architect Ing. arch. Peter Sticzay-Gromski and A4ARCHITECTURE, s. r. o., Bratislava

Redevelopment: apartment buildings in Fuhneweg 18, Brunswick, Germany

General information
Type of building Redevelopment of a multi-storey apartment building from the 1960s
Ventilation concept Regulated apartment ventilation with humidity-regulated exhaust air systems and air transfer devices for supply air
Supply air LUNOtherm B100 with air transfer device ALD-R160L
Exhaust air Carparison ventilation Skalar-F with protection against fire with humidity-regulation and Skalar-G with a controlling, carried out in two stages
Completion August 2006
Energy standard EnEV 2002
Architect Health insurance of the building sector"VVaG, SOKA-Bau"

New building: four apartment houses in Peking, China

General information
Type of building apartment houses with 28 floors
Ventilation concept Regulated heat recovery with humidity-regulated exhaust air systems
Supply air Air transfer devices ALD365
Exhaust air Carparison ventilation Saphir-F with humidity-regulation and Saphir-60 with a controlling, carried out in two stages
Completion March 2006